Current position: Home > Operational Information > Switcheover of Meteorological Mission
Switchover of Meteorological Mission
JMA plans to conduct the maintenance of the MTSAT's ground system
from October to December 2012.
During the system maintenance, MTSAT-1R will be brought back into meteorological observation from F03 (03 UTC Full disk image) on 18 October to N02 (02 UTC Northern hemisphere image) on 26 December.
Further details will be announced via MANAM and MTSAT Status page on this MSC Website.
Reference