MSC-BUL-09-038: 0000UTC on April 3, 2009 MTSAT-1R Sun Avoidance Operation from April 6 to April 12, 2009 In connection with the MTSAT-1R Sun Avoidance Operation (Spring Eclipse Operation), distribution of the following products is scheduled to be stopped, and some images might be distributed with chipping as listed below: Date: April 6-8, 2009 HRIT: N14; Possibility of chipping HRIT: N15; Distribution stop LRIT: PS-N15; Distribution stop Date: April 9, 2009 HRIT: N14; Possibility of chipping HRIT: F15 and N15; Distribution stop LRIT: PS-F15, D1-F15 and PS-N15; Distribution stop Date: April 10, 2009 HRIT: F15 and N15; Distribution stop LRIT: PS-F15, D1-F15 and PS-N15; Distribution stop Date: April 11-12, 2009 HRIT: F15; Distribution stop HRIT: N15; Possibility of chipping LRIT: PS-F15and D1-F15; Distribution stop