MSC-BUL-15-021: 0700 UTC on 26 February, 2015 Discontinuation of HRIT/LRIT distribution on 5 March, 2015 Maintenance of the MTSAT-2 system is scheduled to take place from 20:29 UTC on 5 March, 2015. As a result, the following dissemination will be cancelled: 5 March, 2015 HRIT: F21 LRIT: PS-F21,D0-F21,D1-F21