MSC-BUL-10-029: 0000 UTC on March 19, 2010 Distribution stop of HRIT/LRIT on March 25, 2010 Maintenance work for the MTSAT-1R system is scheduled from 12:45 UTC on March 25, 2010. In connection with this, the following dissemination will be canceled. Date: March 25, 2010 HRIT: F13 LRIT: PS-F13 and D1-F13