MSC-BUL-10-002: 0900 UTC on December 24, 2009 Distribution time change for LRIT on January 5, 2010 Maintenance work for the ground system of MTSAT-1R is scheduled from January 5, 2010. In connection with the work, the distribution time of the following LRIT is scheduled to be changed: January 5, 2010 LRIT PS-N04: the distribution time is changed to 04:30-04:35 UTC.